Home >> Academics >> Supervisor’s Information >> Doctoral Degree Candidates
Li Songhui
Brief Introduction of Li Songhui

Name of

 Supervisor

Li Songhui

Date of

Birth

July. 1979


Gender

Male

Professional Title

Professor

Administrative

Post

Director of the Department of Intelligent Monitoring

Research

Area

Hydraulic Structure Engineering

E-mail


43347904@qq.com

lish@iwhr.com

Telephone

+86-10-68781548

Academic and Professional Experience

2005-2008, Tian Jin University Water Conservancy and Hydropower Engineering, PhD

2002-2005, Hebei Agricultural University, Water Conservancy and Hydropower Engineering, master

1998-2002, Hebei Agricultural University, Water Conservancy and Hydropower Engineering, Bachelor

Brief Introduction to Research Interests and

Academic

Achievements

Research Interests:

(1)Numerical Calculation of Complex Structures

(2)Defect Detection of Hydraulic Structure

(3)Temperature Control and Crack Prevention of Concrete

(4)intelligent construction of water conservancy projects

Academic Achievements:

As the project leader, I was responsible for more than 40 major water conservancy and hydropower engineering research projects such as Fengman Reconstruction, Dateng Gorge, Basha and Dongzhuang, published more than 60 academic papers, published 3 books and 3 standards, authorized more than 40 national invention patents, and won 14 provincial and ministerial science and technology progress awards.

(1)Paper: Songhui Li, Guoqing Liu, Yan Zhang. Nondestructive millimeter-scale void detection for thick steel-shell–concrete interface of immersed tube tunnel: case study[J]. Structural Health Monitoring,2023.(SCI,TOP 1,IF=6.6).

(2) Paper: Li Songhui, Zhang Yan, Feng Shaokon. Void detection and void defect control methods for large-scale immersed steel shell–concrete tunnels[J]. Tunnelling and Underground Space Technology,2023, 134: 105006. (SCI,TOP 1 IF=6.407)

(3) Paper: Li Songhui, Zhang Yan, Han Shasha. Safety inspection system and Comprehensive evaluation method for concrete structure of gas pipeline tunnel based on fuzzy mathematics[J].Advances in Mechanical Engineering,2021, 13(9): 1-14. (SCI,IF=1.316)

(4) Invention Patent:Early Warning and Intervention Decision-making System for Surface Cracking Risk of Mass Concrete, ZL201310507984.8

(5)Invention Patent:Intelligent Temperature Control System and Method for Concrete Mixing,ZL201510609746.7

(6)Invention Patent:Intelligent water Cooling system for mass concrete,ZL201510482870.1

 
 
Contact Us | Copyright@2019|Graduate School of China Institute of Water Resources and Hydropower Research. All Rights Reserved.
Produced By CMS 网站群内容管理系统 publishdate:2024/04/01 11:03:57